糖心视频

September 23, 2011

Image: Orion prepares for next round of acoustic testing

Image Credit: NASA
× close
Image Credit: NASA

The Orion MPCV ground test vehicle is lifted into the acoustic chamber at Lockheed Martin鈥檚 facilities near Denver on Thursday, Sept. 15, 2011, in preparation for the Launch Abort Vehicle Configuration Test.

For this test, the MPCV, or multi-purpose crew vehicle, is covered with fillets and ogive panels which resemble the vehicle鈥檚 launch configuration.

The spacecraft will undergo testing at sound pressure levels that emulate those experienced at launch and in the event an abort is needed to carry the crew to safety away from a potential problem on the launch pad or during ascent.

Provided by JPL/NASA

Load comments (1)

This article has been reviewed according to Science X's and . have highlighted the following attributes while ensuring the content's credibility:

Get Instant Summarized Text (GIST)

This summary was automatically generated using LLM.